Big Changes Coming to Sandy Harbor!
We have some exciting news to share! Phase 2 of our Core Area Master Plan is officially underway, bringing major upgrades to Sandy Harbor Water Park. We’re expanding both our outdoor and indoor pool facilities and improving the Sandy Harbor Game Center. Construction begins this fall after Labor Day, and we plan to have all new facilities ready for Memorial Day Weekend 2027.
What’s New:
- Outdoor Pool: A brand-new resort-style pool with 6,114 sq. ft. of water surface, 36% larger than our current pool, complete with private cabanas.
- Indoor Facility: A new 24,327 sq. ft. climate-controlled, year-round building featuring a pool 235% larger than our current one with a channel and stronger water current for exercise, a kids’ splash pool and aquatic play area, two body slides, and a new food service operation.
- Game Center Expansion: The Game Center will expand into the existing Sandy Harbor Café area, meaning more space for more games and more excitement for guests.
- Behind the Scenes: The indoor facility will also include a second floor with office space, a break room, storage space, and additional space for meetings or private functions.
Get ready for even more ways to soak up the fun at Sandy Harbor!





When Will Construction Begin?
Demolition kicks off September 8, 2026, closing three areas: the original Outdoor Pool (built in the 1970s, 4,500 sq. ft.), the Indoor “All Seasons” Pool (built in 1997), and Sandy Harbor Mini Golf. All three spaces will be used for new construction plus staging materials, supplies, and equipment.
Don’t worry, mini golf fans! We’re working on relocating the course nearby and will share details soon.
What This Means For Your Stay
Pool Access: The Adventure (lazy) River will serve as our pool alternative during construction, weather and site conditions permitting.
HH Section Guests: Expect daily noise from construction equipment moving through the area.
Parking: Pool Area parking will be limited. Overflow parking is available at the Jackson Residence while the Water Park is open.
Why It’s Worth It
These improvements will give our guests and leaseholders more options during our shoulder seasons and winter months, improve their overall experience, and position Ocean Lakes as a top vacation destination year-round, not only along The Grand Strand, but along the entire East Coast for years to come.
Our team implores you to bear with us through this process as we bring these new, outstanding amenities to life in only 8 months. This is a huge project, and it won’t be easy. However, it will be worth it. We’ve done our research, and you won’t find another campground with both indoor and outdoor amenities like this!


Stay in the Loop
Watch for news and announcements about all the exciting changes and new aquatic features over the next few months on our official site, OceanLakes.com. Follow our official social media channels for exclusive behind-the-scenes content and official updates.
Sandy Harbor Phase 2:
A Closer Look at What’s Coming
New 24,327 Sq. Ft. Climate-Controlled Facility
A year-round building featuring a kids’ splash pool and aquatic play area (955 sq. ft.), two body slides, a new food service operation, and restrooms.
Indoor Pool: 3,526 Sq. Ft.
The new indoor pool is 235% larger and features a channel with a water current for exercise.
Outdoor Resort-Style Pool
A brand-new resort-style pool featuring 6,114 sq. ft. of water surface, 36% larger than the current pool.







